Zie:
"For the next IFS upgrade, Cycle 49r1, planned for October 2024, the HRES and the ENS control are being made bit identical. Both will run to 15 days for 00 and 12 UTC. "
En:
"From IFS Cycle 50r1, planned for October 2025, we will stop producing the current ENS control, and the data stream that is currently called the HRES will be called ‘ENS control’ instead. This single, unperturbed forecast will continue to be made available earlier than the ensemble perturbed members, in line with the agreed dissemination schedule."